ISO Bulk Shipping Container Door Gear Handle Locking Assembly Sets Container Door Lock Sets

Still deciding? Get samples of $ !
Order Sample

Product Description

!

Basic Information

Model NO.
ESEN
Material
Steel / Casting Steel
Type
Container Spare Parts
Name
Shipping Container Door Locking Sets
Technique
Forged / Hot Dip Galvanized
Package
Export Pallet
Surface Treatment
Polishing and Zinc Rich Painting
Feature
Anti-Corrosion
Certification
ISO9001, ABS, BV, CCS
Experience
>10 Years
Life Span
>25 Years
Warranty
1 Year
HS Code
7326909000

Product Description

One complete container door lock parts set is inclusive of various components such as locking cam, locking keeper, locking rod, door handle and catch, split bush, and more. These are installed in the container rear door. Every container typically requires 4 sets of complete container door lock parts to ensure the door is locked safely for international transportation.

Container Door Locking Assembly
No. Description Quantity/Set
1Cam2
2Keeper2
3Handle2
4Handle Hub2
5Retainer Catch2
6Retainer Plate2
7Bush2
8Bearing Bracket Outer Large4
9Bearing Bracket Outer Small2
10Split Large Bush4
11Split Small Bush2
12Rivet2
13Anti-Racking Ring8
14Tube2

Product Gallery

Locking Set Detail 1
Locking Set Detail 2
Locking Set Detail 3
Technical Drawing
Packaging
?

Why Choose Us?

01. 28 years of professional experience with 9 AUTO production lines and over 500 employees.
02. Large quantity stock available for immediate shipment to meet your urgent demands.
03. Superior quality control following the "Quality First" principle in all processes.
04. Creation and Innovation to meet increasing customer demands in the global market.
05. Professional Team ensuring smooth and effective communication during negotiations.
Factory Overview 1
Factory Overview 2
Production Line
Q

Frequently Asked Questions

1. Are your container parts of good quality?
Yes, all of our container parts come with ABS, BV, and CCS Certificates, ensuring they pass rigorous international testing standards.
2. What type of container bottom side rails do you provide?
We supply both C type and Z type container bottom side rails.
3. Can we place a mixed parts order?
Absolutely. You can choose and combine different spare parts as per your requirements in a single order.
4. What surface treatments are available for the parts?
Our parts are typically treated with a zinc-rich primer coating or are Hot Dip Galvanized for maximum corrosion resistance.
5. What is the typical production period?
The standard producing period is approximately 20 days, depending on the order volume.
6. Do you provide after-sales technical support?
Yes, we provide online technical support and have a policy for return and replacement if necessary.

Related Products