Model NO.BS-C1
StyleModern
Product ItemAluminum Slat for Shutter
Surface FinishAnodizing; Powder Coating; Polishing
DimensionsOEM/Customized
FabricationCutting, Punching, Drilling, Bending, Weld
StandardsAAMA; DIN; AS; CHINAGB
Quality ControlFull QC Testing System
StructureHorizontal
FunctionHeat Insulation
Production Capacity30,000 Tons Per Year
HS Code7610900000
Our premium Aluminum Slats for Shutters are designed for durability and aesthetic appeal, featuring high-quality aluminum profiles suitable for various modern applications.
20 Years Warranty
Guaranteed long-term performance.
Corrosion Resistance
High resistance to environmental wear.
Weather Proof
5-10 years of superior weather resistance.
Anti-Scratch
Good wear resistance and surface protection.
| Material |
Temper |
Standard |
Surface Treatment |
| Aluminium alloy 6063, 6061 |
T5, T6 |
DIN; AAMA; AS/NZS; CHINAGB |
Mill finish, Anodized, Powder coated, Wood grain, Polished |
Deep Industry Experience
22 years of manufacturing and 12 years of export excellence.
Strong R&D Ability
Expert tool design and advanced surface treatment technology.
Strict QC Management
ISO administration system ensures premium quality.
Flexible Support
Small orders accepted and secondary fabrication available.
Frequently Asked Questions
What is the standard thickness for anodizing?
Our normal thickness is about 10 um, but we can provide 15um and above upon request.
What colors are available for powder coating?
We can produce any color as long as you provide a sample. Standard thickness ranges from 60-80um.
What are your most popular wood grain finishes?
Popular choices include Western Red Cedar, Australia Cedar, Jarrah, Chestnut, and Snow Gum. Custom colors are also available.
How do you guarantee weather resistance?
We use Akzo Nobel Interpon D1010 powder and Italian Memphis film, complying with American AAMA 2603 standards with 1000-hour UV/Salt spray testing.
What are your typical payment terms?
Usually, we require a 30% deposit via T/T, with the remaining balance paid before shipment.
What is the lead time for mass production?
Mass production typically takes 3-4 weeks after receipt of deposit and order confirmation.